Project Overview

project type
Warehouse Management
industry
Automotive
location
Cincinnati, OH

Project Description

In the high-demand, Tier 1 automotive industry, this company was experiencing a 20% decrease in demand and felt it was time to analyze productivity and labor spend on one of its most innovative product lines. Given that their continuous improvement team was already spread thin leading many initiatives and their corporate team was focused on growing capacity and talent, they felt that AMEND's expertise in operational excellence and analytics capabilities would provide the horsepower needed to navigate the (major) market challenge of reduced demand.

80%

Decrease in Expedited Costs

$3.3MM

New cost reduction

15%

increase in throughput

The Solution

Capacity Forecasting Model

We created a capacity model that converted the demand from the 6-month forecast into the amount of needed production labor. We leveraged the model to redesign the production shift schedule to align production labor perfectly with demand.

We eliminated unnecessary overtime, without needing to reduce the actual employee count, saving the organization up to $3.3 million annually.

Optimize Warehouse Management

We redesigned the inventory placement in the warehouse based on inventory value grading, making the materials that move the fastest the most easily accessible.

We streamlined the process to move inventory from the production lines to the docks.

The AMEND Process

Production Throughput Assessment

We walked the floor to understand production constraints and critical job functions.

Designed a Working Model

Built a rapid proof-of-concept model to calculate the labor needed to meet demand. Tested the assumptions over a multi-week period.

Redeployed Production Shift Schedule

Leveraging the scale-up model, AMEND deployed a six-month labor projection and staffing schedule to match production labor with current demand.